How to Prepare Your NYC Apartment for Kitchen Installation

Kitchen Installers Team·

How to Prepare Your NYC Apartment for Kitchen Installation

Installing a new IKEA kitchen in a NYC apartment involves more preparation than a typical suburban renovation. Here's your complete checklist.

Building Requirements (2-4 Weeks Before)

Most NYC co-ops and condos require advance paperwork:

  • Alteration agreement - Submit your renovation plans to the building management or board for approval
  • Insurance certificates - Your installer must provide certificates of insurance naming the building as additionally insured
  • Work hours - Confirm permitted work hours (typically Monday-Friday, 9am-5pm in most buildings)
  • Elevator reservation - Book the freight elevator for material delivery and debris removal
  • Neighbor notification - Many buildings require written notice to adjacent units

IKEA Delivery Preparation (1 Week Before)

  • Verify your order - Cross-reference your delivery confirmation with your kitchen plan
  • Clear a staging area - IKEA kitchen boxes take up significant space. Clear a room or hallway
  • Building delivery rules - Confirm with your super: delivery entrance, elevator availability, floor protection requirements
  • Inventory on delivery day - Open and check every box against your order. Report missing items to IKEA immediately

Kitchen Area Preparation (2-3 Days Before)

  • Empty all cabinets - Remove dishes, food, cleaning supplies — everything
  • Disconnect appliances - Unplug refrigerator (and let it defrost), disconnect gas range (call your gas company)
  • Clear countertops - Remove small appliances, knife blocks, canisters
  • Protect adjacent rooms - Lay drop cloths or cardboard to protect floors in hallways
  • Set up a temporary kitchen - Move essentials (microwave, coffee maker, dish soap) to another room

Utility Considerations

  • Gas shutoff - If your stove is gas, you may need Con Edison to shut off and restore gas service
  • Water access - Ensure the installer can access shutoff valves for the sink area
  • Electrical circuits - Know where your circuit breaker panel is and which circuits serve the kitchen

Day-Of Installation Checklist

  1. Confirm freight elevator reservation with super
  2. Ensure clear path from elevator/entrance to kitchen
  3. Have building's emergency contact numbers handy
  4. Plan to be available (or designate someone) to answer installer questions
  5. Keep pets in a separate, closed room
  6. Have cash or a tip ready if desired

Special Considerations for NYC Co-ops

Co-op boards are notoriously strict about renovations. Be prepared for:

  • Board review of your contractor's license and insurance
  • Possible requirement for an architect's letter
  • Restrictions on work during summer months or holidays
  • Security deposit (refundable) for common area protection

We handle all building coordination as part of our service for apartments in Manhattan, Brooklyn, Queens, and throughout the NYC metro area. Get a free quote and let us handle the logistics.

Ready to Start Your Kitchen Project?

Get a free quote for your IKEA kitchen installation in New York or New Jersey.

Get a Free Quote